AWS D1.1 Explained: What the Structural Welding Code Means for Owners and Contractors

AWS D1.1, the Structural Welding Code – Steel, is the American Welding Society standard most U.S. projects use to define how structural steel welds are designed, made, qualified and inspected. If your drawings mention it, every weld on the job is expected to follow written procedures, be made by qualified welders and be inspected to stated criteria. Here is what that means in practice, and what to ask for before anyone strikes an arc.

Updated October 2026

Aluminum welding repair by Alpha Mobile Welding TX

What AWS D1.1 covers

D1.1 applies to welding of carbon and low-alloy structural steel: beams, columns, braces, base plates, moment connections, canopies, mezzanines, stairs and platforms, and similar framing. It is not a design manual for the building itself. The engineer still decides member sizes and loads, usually under the AISC steel specification and the building code. D1.1 picks up where design leaves off, setting the rules for weld joint details, welding procedures, welder testing, fabrication workmanship and inspection.

The code is revised periodically, so contract documents normally name the edition that applies. Other AWS codes cover other materials and structures: D1.2 for aluminum, D1.3 for sheet steel, D1.5 for highway bridges and D1.6 for stainless steel. Using the right one matters, because a procedure written for one does not automatically satisfy another.

Welding procedure specifications: prequalified vs qualified

A welding procedure specification, or WPS, is the written recipe for a weld. It lists the process (such as SMAW stick, FCAW flux-core or GMAW MIG), base metal, filler metal classification, joint design, position, preheat and interpass temperature, and the electrical settings and travel speed range. Under D1.1, a WPS can be established in one of two ways.

Prequalified WPS

D1.1 lists combinations of processes, base metals, filler metals, joint geometries and other variables that have a long record of producing sound welds. A WPS that stays inside every one of those limits is prequalified, meaning it can be used without procedure qualification testing. Common structural work, such as fillet welds and standard groove joints in common structural grades using SMAW or FCAW, is often done under prequalified procedures. The procedure still has to be written down; prequalified does not mean unwritten.

Qualified WPS

When a job steps outside the prequalified limits, for example an unlisted steel, a nonstandard joint, or a process or mode the code does not prequalify, the contractor must qualify the procedure by testing. Test plates are welded under controlled conditions and then cut, bent, pulled and sometimes impact tested. The results are recorded on a procedure qualification record, or PQR, which supports the WPS. Ask to see both documents when a qualified procedure is used.

Welder performance qualification

A good procedure is only as good as the person following it. D1.1 requires each welder, welding operator and tack welder to pass a performance test for the process, position and thickness range they will weld. The test coupon is examined by visual inspection and by bend tests or radiography, depending on the test. The result is documented on a welder performance qualification record.

Qualification is tied to the process and limits tested, so a welder qualified for flat-position FCAW is not automatically qualified for overhead SMAW. The code also expects evidence that the welder has kept using the process; a qualification can lapse after a period without use. A current, signed record with the welder’s name, process, positions and date is what you want to see.

Completed aluminum welding job

Inspection: visual first, then NDT where specified

Every completed structural weld gets a visual inspection. D1.1 sets acceptance criteria for things like cracks, lack of fusion, undercut, porosity, weld size and profile, and the inspector compares each weld against them. Much of the useful inspection happens before and during welding: checking fit-up and root openings, preheat, filler identity and storage, and that the WPS is posted and followed.

Nondestructive testing (NDT) goes further where the engineer calls for it. Ultrasonic testing (UT) and radiographic testing (RT) look inside groove welds, while magnetic particle (MT) and dye penetrant (PT) testing find surface and near-surface cracks. NDT is not automatic; its type, extent and acceptance criteria come from the contract documents, typically for complete-joint-penetration welds in critical connections.

Quality control vs quality assurance

D1.1 separates the contractor’s own inspection, often called quality control, from verification inspection done on behalf of the owner or engineer, often called quality assurance. Inspectors are frequently AWS Certified Welding Inspectors or hold an equivalent qualification acceptable to the engineer. Owners should know which inspector works for whom.

Who is responsible for what

Engineer of record

The engineer of record designs the structure and shows weld types, sizes and lengths on the drawings, along with any special requirements such as demand-critical welds, NDT, or toughness for filler metal. The engineer reviews shop drawings and submittals and approves changes. Any field substitution, such as a different joint, a new connection or a repair to a damaged member, should go back to the engineer rather than be decided on site.

Special inspection and the building official

Texas cities generally adopt building codes based on the International Building Code, which requires special inspection of certain structural steel work, including many welded connections. The owner or the owner’s agent usually hires the special inspection agency, and the registered design professional prepares a statement of special inspections listing what must be checked. The local building official issues permits, accepts inspection reports and can stop work that lacks them. Requirements differ by jurisdiction and project, so confirm them with your engineer and the building department early.

Permit first, steel second

If structural welding is part of a remodel or repair, confirm the permit and inspection path with your engineer and building department before any welding is scheduled.

What owners and general contractors should ask for

You do not need to read the code cover to cover to manage a welded steel scope well. Before structural welding starts, request:

  • Sealed or approved drawings that show weld symbols, sizes and any NDT requirements
  • The WPS for each process and joint type, plus PQRs for any non-prequalified procedure
  • Current welder performance qualification records for every welder on the job
  • An inspection plan naming who does QC, who does QA or special inspection, and what will be tested
  • Filler metal data sheets and confirmation of preheat practice for the steel and thickness
  • A process for documenting repairs and getting engineer approval for field changes

Keep the resulting reports with your project records. They are often needed for the building official’s final sign-off and are useful if the structure is modified later.

Where field and mobile welding fits

Plenty of structural welding happens on site: setting base plates, connecting beams, adding lintels, and installing a support beam for a load-bearing wall. Field conditions such as wind, moisture, cold steel and awkward positions make preheat control, shielding and fit-up harder, which is why procedures and inspection matter even more outside the shop.

Alpha Mobile Welding TX coordinates on-site welding through partner welders. For engineered work, we expect the engineer’s drawings, procedures and inspection requirements to drive the job, and we confirm whether a given partner can meet the project’s documentation requirements before quoting. For more on this kind of work, see structural welding, industrial construction welding and mobile steel welding.

Related services

Need a welder?

Send photos and your location and we will check partner availability and give you an estimate.

Free estimate

Need a Free Estimate or Quote for Welding Work?

Submit your info and we will call you back as soon as possible. Prefer to talk now? Call 979-250-7486.

Presupuesto gratis

¿Necesita un presupuesto gratis para trabajos de soldadura?

Envíe sus datos y le llamaremos lo antes posible. ¿Prefiere hablar ahora? Llame al 979-250-7486.